Dust Suppression and Temperature Reduction System

Arabian Cement

The project involved the design and implementation of a dust suppression and temperature reduction system at the coal storage yard. It also included the installation of the necessary electrical and water networks to support these systems. Additionally, production lines' water and compressed air backup networks were developed to ensure continuous operation and optimize performance. This project was crucial in improving operational efficiency and maintaining safety standards at the plant.

ClientArabian Cement
DesignerMbltz
Service Provided

Dust Suppression System

Temperature Reduction System

Electrical and Water Networks

Water and Compressed Air Backup Networks