Dust Suppression and Temperature Reduction System
Arabian Cement
The project involved the design and implementation of a dust suppression and temperature reduction system at the coal storage yard. It also included the installation of the necessary electrical and water networks to support these systems. Additionally, production lines' water and compressed air backup networks were developed to ensure continuous operation and optimize performance. This project was crucial in improving operational efficiency and maintaining safety standards at the plant.
Client | Arabian Cement |
---|---|
Designer | Mbltz |
Service Provided | Dust Suppression System Temperature Reduction System Electrical and Water Networks Water and Compressed Air Backup Networks |